With the continued flooding problems throughout Worcestershire, 100 Army personnel have been drafted in to provide support.
We have agreed to set up joint Ringway/Army teams to operate from our highway depots.
This morning at 7.30am at all the depots a joint Ringway safety briefing was held before the joint teams were deployed to carry out flood alleviation works on the network.
No comments:
Post a Comment